Modification to Service

Modify Service

Before any construction is begun on an existing structure, you should apply for a permit if the work is likely to affect the sewer service to that structure.  If a structure’s sewer service lateral must be replaced because of deterioration of the line, a sewer permit must also be obtained before any construction is to begin.  In either case, the construction must be inspected by W.A.A.

Sewer Connection Permits must be obtained at the Authority’s business office during regular business hours.  If you prefer, we can shorten your visit by having your permit ready for you.  Just call ahead with the necessary information:

  • Location of the lot including Map/Block & Lot #
  • Owner’s name, current mailing address, and phone number
  • Contractor’s name, address, and phone number

In addition, a check for $50.00 (inspection fee) made payable to W.A.A. is required before the permit can be issued.


Modifications to Service
Inspection Fee: $50.00
Sewer Connection Permit